The treatment plant for the VILLAS DE LAS FLORES project is of the anaerobic filter type.
It will have a total capacity to.
The plant will be constructed in 2 double modules in parallel. Each module has a capacity to process 7 cubic metres per hour, up to a maximum of 10 cubic metres per hour. No electric motors are needed, as it benefits from the slope so that the wastewater enters the plant and leaves treated entirely by gravity.
The water treated by the treatment plant has two end points. The first is a discharge into a stream that runs alongside the treatment plant.
The second option, when there is a dry season, is to send the water to a storage system to later use it for watering the green areas of the project.